Saturday 19 November 2016

My longest ride 60 km

Been doing my 30k average rides for a while now.
The year end weather hasn't been helpful with rain on most Sat morning.
Today was the same, except the afternoon was cloudy/overcast, good for a trip out.

I try to utilise the PCN (Park Connector Network) where it is safer to ride without the traffic.
Of late, there has been lots of road accidents involving cyclists.

Click image for larger view


Journey started from Bartley road / Braddell road
Kallang PCN - after Comfot Delgro building
Kallang Riverside Park
Passed F1 Pit Building
The Float at Marine Bay, crossed the bridge along Bayfront Avenue
Gardens By The Bay to Marina Barrage
East Coast Park
Changi Coastal PCN
Changi Point PCN
Late lunch at Changi Village
Loyang PCN
Pasir Ris PCN
Lor Halus (Though Halus Bridge)
Punggol Promenade PCN
Serangoon PCN
Lorong Ah Soo

Total 60 km in about 5 hours

Thanks to the Brooks Saddle, butts ok during the long cycle.

The Float at Marina Bay

The Float at Marina Bay

After Marina Barrage

Changi Coastal PCN 

Changi Coastal PCN


Changi Point PCN

Changi Village (Late Lunch)

It has been a satisfying ride. The last time i rode, i had to retire at about 45km when my left leg's IB (Iliotibial Band) swell so bad.


Thats me at Gardens by the Bay

Changi Village Ferry


No comments:

Post a Comment