Great to see improvements to the PCN network. more convenient and safe for cyclists!
Due to NDP rehearsals, I decided not to travel past the floating platform and took the eastern route which i have not done some time now.
The thought of crossing the two overhead bridges across Aljunied and PIE put me off and i cycled through Sims Avenue / Geylang Lor instead.
New additions:
East Coast Park to PCN Tanah Merah Coast Road (Red Line)
PCN connector linking Pasir Ris Drive 3 and Pasir Ris Farmway 3 (Blue Line)
The new PCN Pasir Ris Dr3 & Farmway 3 connector which previously was an unlit canal path.
The cut through saved lots of time and safer to transit vs the pavement and roads.
Bedok Jetty looks really beautiful from the facelift with red patterned tiles. Lots of Anglers on site.
It took me 60 mins to cycle from Bedok Jetty to Changi Beach.
Total distance 66km, 6am to 12.20pm
No comments:
Post a Comment